
The Details
Work done:
- Removed carpets from stairtreads and landings.
- Installed hardwood floors on the landings
- Installed new newel posts and handrails
- Site finished the newel posts, handrails, stairtreads and landings – sand, stain and 3 coats of polyurethane
- Installed new metal balusters (pickets) and brackets